Toripiha’s HPP plant in Suonenjoki

 

We have built Finland’s first industrial-scale HPP production/logistics centre in Suonenjoki. The floor area of ​​the plant is about 4000 m2.

In addition to the 800 m2 production area, the plant has a heat-regulated space (temperature range +5 – -20 ° C) of 1800 m²/12,600 m³ divided into five storage areas. The HPP equipment capacity is about 1500 kg/h.

Main contractor:

 

Further information:

Juho Kylmälä,
Managing Director
Tel. +358 (0)10 425 2703
juho.kylmala(at)toripiha.fi

Check out the photos of the construction during different phases: